▫ Project Summary: MONG DUONG Ⅰ COAL FIRED POWER PROJECT -DOOSAN E&C-HYUNDAI E&C
▫ Location: Mong Duong, Cam Pha, Quang Ninh, Viet Nam. ▫ Work Scope: Jet Grouting, Completion of Ground Anchor for Pump House and Permanent Ground Anchor for Fore Bay Area(CIP Wall) ▫ Jet Grouting Diameter: D1500mm / 5,520m ▫ Tension Load: D55~65ton / J55~73ton ▫ Geological Condition: Weathered rock & siltstone ▫ Anchor Type: Permanent Anchor 15.4mm x 5 ▫ Length / Holes: 5,277m / 225holes ▫ Volume: 3,042㎥ |
|