"Mong Duong 2 Thermal Power Project (Quang Ninh Province) is a premier national energy development invested by AES Corporation, Posco Energy, and constructed by Doosan Heavy Industries.
1. Project Parameters
▫ Client: AES-TKV Mong Duong Power Company Limited.▫ EPC Contractor: Doosan Heavy Industries & Construction.▫ Specialist Geotechnical Contractor: KR VINA Co., Ltd.▫ Scope: Construction of high-capacity micropile foundation units (d=200mm - 300mm) socketed deeply into sound bedrock.
2. Engineering Challenges & KR VINA Solutions
Complex weathered strata and severely restricted vertical headroom between heavy foundation columns required compact high-torque drilling technology.KR VINA deployed specialist compact hydraulic drilling rigs, achieving exceptional load-bearing performance, meeting stringent international safety criteria, and finishing ahead of scheduled milestones.
"
▫ Project Summary: THE GRAND HILL PROJECT HA NOI - BID VIETNAM JV COMPANY▫ Location: 99 Tran Binh, Nam Tu Liem Ha Noi, Viet Nam.▫ Work Scope: Underground Work, Ground Anchor for 2nd Apartment Tower(29F, 2Basement)▫ Temporary Anchor: 12.7 x 4ea▫ Length / Holes: 1,000m / 50holes▫ Tension Load: D25ton, J25ton
Aeroview
Construction progress